.header__wrapper { opacity: 1; } [Skip to content]

Services ran through both buildings and, as part of this project, these were diverted, terminated and reinstated to maintain the retained facilities. Asbestos was present within both buildings and was removed prior to soft strip. 

As part of the works, some existing fire escape stairs were removed or altered and new external entrances and fire escape stairs installed where required.

The location of this project and the constraints of working in a live hospital environment made this project particularly demanding, with exceptional diligence being required to ensure that the project had minimal impact on users of neighbouring buildings. 

Great consideration was given to the environmental impacts of this project and the demolition at Imperial College, Hammersmith Campus was planned and undertaken so as to have the least possible effect on the surrounding environment utilising control measures in respect of noise, dust and vibration to keep the nuisance at acceptable levels.